This kitchen in Madeira is having granite tops installed↓↓
The cabinet trim is finished and the tumbled stone tile backsplash is being installed↓↓
Posted by John
This kitchen in West Chester is nearing completion. Backsplash tile is grouted, floor tile has been patched, cabinet hardware is installed and painting is underway. Almost there↓↓
Cabinet installation is finishing, granite tops are installed and tile backsplash is being installed↓↓
West Chester kitchen gets cabinets, granite tops and tile backsplash↓↓
Granite tops are being installed↓↓
The tile backsplash is being installed↓↓